How much recovered copper can generate per day
The calculation uses the LME copper price in US dollars, read automatically from the Shock Metais bulletin and updated at 6 pm Brasília time. You set the capacity, the copper content in the cable, the operating hours and the efficiency; the page shows the revenue the material generates per day, month and year.
Quote used in the calculation
Quote of Nov 26, 2026 · read at 11/27, 01:27 AM · Source: Shock Metais (LME). The bulletin is read automatically and updated daily at 6 pm Brasília time. Open the LME bulletin
Simulate your operation's revenue
The fields start with the scenario you asked for: 8 hours a day, 80% efficiency and 40% copper content. Change whatever does not match your reality.
Effective time the machine spends processing, after material changes, knife sharpening, cleaning and stops.
- Cable processed per day
- 576 kg
- Copper recovered per day
- 230 kg
- Revenue per month (22 days)
- US$ 60,648
- Revenue per year
- US$ 727,778
- Revenue per tonne of cable
- US$ 4,786
Gross revenue from the copper contained in the processed material. This is not profit: it does not deduct the cost of the input scrap, energy, labour, maintenance, losses, freight or taxes.
Three scenarios on the same machine
Same capacity, same 8 hours a day and 80% efficiency. Only the copper content in the cable changes.
| Scenario | Copper revenue per day | Revenue per month (22 days) |
|---|---|---|
| Conservative · 35% copper | US$ 2,412 | US$ 53,067 |
| Likely · 40% copper | US$ 2,757 | US$ 60,648 |
| Optimistic · 45% copper | US$ 3,101 | US$ 68,229 |
How the calculation is made
No number is typed by hand. The quote comes from the bulletin, the capacity from the catalogue, and the rest is multiplication.
- Copper in US$/kg = LME price (US$/t) ÷ 1,000.
- Cable processed per day = capacity (kg/h) × hours per day × efficiency.
- Copper recovered per day = cable processed × copper content in the cable.
- Revenue per day = copper recovered × copper price in US$/kg.
What is data, what is calculation and what is estimate
- Data
- Copper quote from the Shock Metais bulletin, with the reference date. Machine processing capacity from the Recmax catalogue.
- Calculation
- Cable processed, copper recovered, revenue per day, month, year, per tonne of cable and payback.
- Estimate
- Copper content of 35% to 45%, 80% efficiency, 8 hours a day, 22 days a month, cable cost and investment entered by you.
What the calculation does not include
The page shows revenue, not profit. Reaching the real result requires the items below.
- The cost of the input scrap, which is the largest item in the calculation.
- Electricity for motors and aspiration.
- Direct and indirect labour for the operation.
- Maintenance, knives, screens and spare parts.
- Material losses, moisture and batch contamination.
- Freight, taxes, working capital and depreciation.
Why this page does not show the machine price
The investment changes with the model, accessories, automation level and line layout. A fixed published figure would be wrong in most cases and would promise what the configuration does not deliver.
What can be proven without the price is the revenue: with 8 hours a day and 80% efficiency, the operation generates every day the value shown above. Payback is that revenue against your own investment — and the hypothetical investment field exists so you can test your scenario, not to suggest a price.
When you enter the cable cost, the page calculates the contribution margin: what remains before energy, labour and maintenance. It is the closest figure to the real result that can be calculated without your internal costs.
Where the capacity used here comes from
The kg/h ranges come from the granulating mill and Turbo line pages. Before agreeing a figure with a client, check each series table.
Frequently asked questions
Where does the copper quote come from?
From the Shock Metais daily bulletin, which publishes the LME copper price in US$ per tonne. This English version works entirely in US dollars; the Portuguese version converts the same quote to reais using the bulletin's dollar rate. The reading is automatic and the update happens at 6 pm Brasília time. The LME quote is an international reference: the price your buyer pays is usually lower, due to payment terms, impurity, freight and discount.
Why is the copper content between 35% and 45%?
It is the typical range for insulated building cable. The real figure changes with conductor gauge, insulation type and thickness, and the presence of an outer jacket. Thin data cable has proportionally less metal than thick power cable. The only reliable figure for your material comes from a test with 20 to 30 kg of your sample.
Why 80% efficiency and not 100%?
Because 8 hours of shift are not 8 hours of the machine processing. In between there are material changes, knife sharpening, cleaning, screen adjustment and maintenance stops. The 80% is a stated assumption, not a promise: if your operation stops less, raise the figure and watch the result grow.
Is this revenue profit?
No. It is the gross revenue from the copper contained in the processed material. Profit depends on the price you pay for the input scrap, energy consumption, labour and maintenance. By entering the cable cost in the optional field, the page shows the contribution margin, which already deducts that cost.
Does the calculation work for aluminium?
No. Aluminium has a different LME quote and a different content in the cable, and mixing both metals in the same batch lowers the value of the granulate. For an aluminium scenario, ask engineering for a separate calculation.
How often is the quote updated?
Every day at 6 pm Brasília time. If the bulletin does not yet have the day's row, the page shows the most recent available quote and states its date — never a figure without a date.
Turn the simulation into a proposal with your sample
Send 20 to 30 kg of the cable you process. The test measures the real copper content and the capacity with your material — the two numbers that change the calculation above.
